Red Hat Expansion Project

  • Vk e
  • VK e 2

Project Name : Red Hat Expansion Project

Location : Magarpatta SEZ, Hadapsar, pune

Client : Red Hat Linux

Typology : Office

Certification : LEED Commercial Interiors-Gold Rating (Completed)

Built Up Area : 2100 sq.m

Green Highlights of the project:

  • 55 % improvement in Air conditioning saving 20 lacs annually enable by Air Cooled VRV system with high end controllability and efficiency.
  • Daylight integrated artificial lighting using photometric controls & dimmers.
  • High efficacy task and general lighting with reduced lighting power densities and occupancy sensors keeping artificial lighting requirement and costs to minimum.
  • Low-embodied energy materials for furniture , FSC certified products.
  • CO2 sensors programmed to generate an alarm to regulate fresh air intake offering good indoor air quality and increased work productivity.
  • Use of low VOC finishes and Carpets.
  • Energy star rated equipment save energy.
  • Base building treats 100% of wastewater on-site to tertiary standards which is then either infiltrated or used on-site.
  • Bicycle storage and shower facilities.
  • 32 % reduction in water use by using low flow fixtures and STP water for flushing.
  • ENERGY STAR-rated equipment and appliances equal to 77.88%, by rated power.
  • Sub-meters for lighting systems, plug loads, and electric cooling to monitor energy consumption for different services.
  • Diversion of 99% of the on-site generated construction waste from landfill.
  • 5% of the total building materials value includes rapidly renewable building materials and products.
  • Low VOC interior paints, adhesives and sealants used in the project.
  • Urea formaldehyde wood based materials.
  • ANSI/BIFMA certified furniture and office seating ensure occupant comfort and ergonomics.
  • Ventilation and temperature controls to enable 88.17% of the tenant occupants with the ability to make adjustments to suit individual needs and preferences.
  • 97% of all regularly occupied space  are day lit.
  • Implementation of a thermography based electrical connections maintenance strategy to maintain health and safety standards for users higher than the prescribed benchmarks.